NORTHROP LIGHTING STUDY
Fort Wayne Community Schools
Fort Wayne, Indiana

 

Highlighted Projects

 

Northridge HS

$48.5M

North Side HS

$39.0M

John Adams HS

$36.8M

Bishop Dwenger HS

$3.4M

James Madison MS

$11.0M

Homer ES

$4.3M

SBCS Ed Ctr

$$6.4M

Notre Dame

Culver Academy

$$7.5M

NACS Natatorium

$2.5M

FWCS Plant Improvements

Northrop Lighting Study

Lake Hills Elemtary

$3.5M

Brandywine HS

$3.5M

Snider HS Baseball Field


Back to Educational Portfolio

Back to Portfolio

 

 

 


Completed June 2007

SCO provided…
Electrical
Land Surveying

SCO Provided a hybrid topographic survey of portions of the school campus to determine existing light level conditions. Light level readings were taken at approximately 10-foot intervals within the project areas utilizing a heavy duty light meter. The horizontal location of said readings and their corresponding foot candle values were surveyed and recorded utilizing a robotic total station. AutoCAD Land Desktop was utilized to process over 3,900 individual light level readings, to prepare the surface models of the existing lighting levels and to create the contour lines of equal foot candle value needed to analyze the existing lighting conditions.