51,000 sq.ft.
$6.4M Construction Cost
Completed September 2006
SCO provided…
Mechanical
Electrical
Plumbing
Civil
Architect
Hebard & Hebard Architects
|
|
|
In this renovation, a new self-contained DX with hot water reheat was added
along with new hot water risers. The design consisted of a low temperature
variable air volume with static re-gain including a fan powered series box
for the VAV. New lighting and technology was installed to the existing
electrical distribution system along with a new stand-by generator. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|