EDUCATION AND TRAINING CENTER
South Bend Community School Corporation
South Bend, Indiana

 

Highlighted Projects

 

Northridge HS

$48.5M

North Side HS

$39.0M

John Adams HS

$36.8M

Bishop Dwenger HS

$3.4M

James Madison MS

$11.0M

Homer ES

$4.3M

SBCS Ed Ctr

$$6.4M

Notre Dame

Culver Academy

$$7.5M

NACS Natatorium

$2.5M

FWCS Plant Improvements

Northrop Lighting Study

Lake Hills Elemtary

$3.5M

Brandywine HS

$3.5M

Snider HS Baseball Field


Back to Educational Portfolio

Back to Portfolio

 

 

 

51,000 sq.ft.
$6.4M Construction Cost
Completed September 2006


SCO provided…
Mechanical
Electrical
Plumbing
Civil

Architect
Hebard & Hebard Architects


 
 
 

 

 
In this renovation, a new self-contained DX with hot water reheat was added along with new hot water risers.  The design consisted of a low temperature variable air volume with static re-gain including a fan powered series box for the VAV.  New lighting and technology was installed to the existing electrical distribution system along with a new stand-by generator.