27,000 sq. ft. - elementary
20,000 sq. ft. - jr/sr high school
$3.5M Construction Cost
Completed 2008
SCO provided…
Mechanical
Electrical
Plumbing
Architect:
Hebard & Hebard Architects
|
|
The Brandywine Elementary project included the demolition of an existing
classroom wing, re-building a new main entry, and renovation of classrooms,
locker rooms, and other spaces. The existing building was served by a
combination of steam and hot water heat. The steam boilers were converted to
hot water and all the remaining steam heating units in the building were
replaced with new hot water heating units and hot water piping. All
equipment and piping is sized for future cooling capability using a two-pipe
system.
The Brandywine Junior/Senior High School project included a complete
renovation of the band room, choir room, and varsity locker rooms. The
existing hot water boiler system was extended to new equipment in these
areas and all equipment is sized for future cooling with a two-pipe system.
All new plumbing fixtures and piping were installed in the locker rooms. Air
conditioning units and ductwork were installed in the administration area.
|
|
|
|