|
700 sq.ft.
$600,000 Construction Cost
Completed 2007
Architect
Kelty Tappy Design
SCO provided…
Mechanical
Electrical
Plumbing
Civil |
|
|
Addition of a small vestibule to create a day chapel within the
existing building. A new rooftop air conditioning unit was added for
the day chapel. The existing boiler was replaced with modular energy
efficient boilers.
|
|
|
|